Cobra MPC SERIES Bedienungsanleitung Seite 6

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 12
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 5
COBRA INSTALLATION AND PROGRAMMING GUIDE
Installing the Cobra
57010-H Page 6 12-19-2005
7) Install the Outside Escutcheon:
8) Install the Inside Baseplate Assembly:
If necessary, apply exterior gasket (EG
option) to surface (a).
Insert the round end of the spindle* (b)
into the outside escutcheon’s hub
assembly (c).
Dot on cam (d) must be at the 6 o’clock
(bottom) position.
From outside of door, feed outside
escutcheon’s battery wire harness (e)
through hole (f) in door.
Slide escutcheon against door.
*
Refer to the chart below to determine the
correct spindle to use.
*
b
c
d
e
f
a
Ob
serve t
h
e po
l
ar
i
ty mar
ki
ngs
i
ns
id
e t
h
e
b
attery
h
o
ld
er
(
a
)
an
d
install the 4, AA batteries (provided) accordingly.
From inside of door, feed battery wire harness (b) through hole
in spacer (c) if needed *.
Feed battery wire harness through hole in inside baseplate
assembly (d).
Press baseplate (and spacer, if there is one) against door.
*
Spacer required on doors thinner than 1-1/2”.
spacer required on doors thinner than 1-1/2”
Order P/N: MPC-SK
a
b
d
c
Seitenansicht 5
1 2 3 4 5 6 7 8 9 10 11 12

Kommentare zu diesen Handbüchern

Keine Kommentare